Skip to main content

Home  Mission  About Us  Service  Technical Information  Contact Information   
1. > 2. > 3. > 4. > 5. > 6. > 7. > 8. > 9. > 10. >  
Power Interruption when Manual Bypass Switch was miss-operated.
 
 
 

During a recent UPS PM, the Manual Bypass Switch was miss-operated by maintenance personnel from the Bypass to Normal position. The switch in the normal position is at the 10 o'clock position and in the bypass position is at 2 o'clock.

The switch was forced to the 9 o'clock position and opened, this de-energized all connected loads. Make sure

you do not force a Manual Bypass Switch to a position it was not designed for.